• image06

OUR SOLUTION
HVAC ( ASSOCIATED SERVICES )



Design Basis Report :


  • Brief description of the project
  • Inside application consideration
  • Load components considerations
  • Building management system description
  • Cooling load summary
  • HVAC System recommendations & proposed system for the project.

Concept Design :

Preparation of P&I Schematics for chilled water system, condenser water system if it is water cooled ,HVAC Equipment list, building management system schematic, Air-flow line diagram(without size), chiller plant room concept layout, AHU Room concept layout, Equipment schedule.


Technical Specification :

Preparation of materials & Equipments specifications for


  • Control Valves
  • BMS Controllers
  • Valves
  • Piping & Materials
  • Ducting & Materials
  • Insulating Materials etc..

Bill of Quantities :

Preparation of bill of quantities for equipments, CHW& CW Piping, HVAC Ducting, Valves, Instruments & BM



Tender Drawing, Tender Specification & Construction Drawings :

Preparation of P&I Schematics for chilled water system, HVAC Equipment list, Building management system schematic, Air-flow line diagram (without sizes), chiller plant room details design layout, Tender Preparation & floating the tender, requesting proposal from the vendors, Tender evaluation & Contractor recommendations.